Year: 2024
Location: Sebright, ON
Client: City of Kawartha Lakes
- Multi-stage traffic control and construction
- Environmental protection measures and site isolation
- Partial-depth and full-depth asphalt pavement removals
- Removal and replacement of the guide rail
- Earth excavation for structure and approaches
- Type A, B & C concrete removals and repairs
- Removal and replacement of Concrete Curb and Gutter
- Full-depth and partial-depth concrete removals
- Concrete in substructure, deck, and parapet walls and approach slabs
- Bridge deck waterproofing and paving

